Thursday, March 10, 2011
Heil Ranch Trail Day
BMA is partnering with Boulder County Parks and Open Space for trail maintenance on the Wapiti Trail at Heil Valley Ranch this spring.
If the weather cooperates we are hoping to start work next Saturday, March 12, 2011 with a spring storm delay postpone date of March 19th and then we will keep trying every Saturday until mother nature decides to let us on her door step.
We will meet at the the South trailhead off LeftHand Canyon, Geer Canyon at the pavilion at 8:30 AM. Our project site will be near the bridge above the meadow. We'll have a County vehicle to take some people and encourage folks to ride or walk up to the site.
We will run till 12:30pm with an option to stay longer if there is need and interest. Bring a smile, the willingness to get dirty, water, snacks, gloves, sturdy shoes and gear appropriate for Colorado weather. Limit is 15 people.
mtbcolorado@yahoo.com
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment